Pat Logan’s layout. The first train to reach the crossing holds it. The other track’s crossing section stays dead until the first train clears both of its sensors.
Relay 1 cuts Track 1’s crossing section and picks up when Track 2 holds the crossing. Relay 2 cuts Track 2’s section and picks up when Track 1 holds it. The two relays are cross-locked, so only one can be energized at a time.
| # | From | To |
|---|---|---|
| Track 1 detection | ||
| 1 | Sensor A yellow + Sensor B yellow (joined) | Relay 1, Pole 2 COM |
| 2 | Relay 1, Pole 2 NC | Relay 2, DETECT |
| Track 2 detection | ||
| 3 | Sensor C yellow + Sensor D yellow (joined) | Relay 2, Pole 2 COM |
| 4 | Relay 2, Pole 2 NC | Relay 1, DETECT |
| Track power | ||
| 5 | Track power bus | Relay 1, Pole 1 COM |
| 6 | Relay 1, Pole 1 NC | Track 1 crossing section (gapped rail) |
| 7 | Track power bus | Relay 2, Pole 1 COM |
| 8 | Relay 2, Pole 1 NC | Track 2 crossing section (gapped rail) |
| Gates / flashers | ||
| 9 | D1 banded end → Track 1 detect line | D1 other end → Signal Controller DETECT |
| 10 | D2 banded end → Track 2 detect line | D2 other end → Signal Controller DETECT |
| 11 | Signal Controller outputs | Crossing flashers (alternate flash) |
| Power | ||
| 12 | 12 VDC supply + | Every red wire / +12VDC terminal |
| 13 | 12 VDC supply − | Every black wire / GND terminal |
NO terminals are not used. Run every board from the same 12 VDC supply so all the detector signals share one ground.
| Qty | Product | Job |
|---|---|---|
| 4 | MTT Precision Detector | Sensors A and B (Track 1), C and D (Track 2) |
| 2 | MTT DPDT Relay for Precision Detector, 5A | Pole 1 switches track power. Pole 2 is the lockout. |
| 1 | MTT Signal Controller | Crossing flashers, set to behavior 8 or 9 |
| 2 | Small Schottky diode (e.g. 1N5817) | Lets either track trip the flashers without tying the two tracks’ detector signals together |
| 1 | 12 VDC supply | Powers everything |
Sensors A and C: aim each one at the spot where a stopped train waits, just before its dead section. That way the waiting train still holds its detector signal when the crossing clears.
Detector timeout: the line is only “occupied” while a detector sees the train or is timing out. Set the timeout long enough to cover the gap between the two sensors on each track.
Dead sections: gap one rail at both ends of each section. Make the section longer than your longest locomotive.
If the PDF doesn’t show above (some phones and tablets can’t display PDFs inside a page), use “Open PDF” or “Download PDF”.